Skip to content
Giuliani

Production of mineral premixes.

Processes involved

Giuliani Hermanos, with its manufacturing plant in Rafaela, Santa Fe, develops installations for producing mineral premixes, with solutions aimed at handling, dosing and mixing raw materials within one integrated, controlled process.

A mineral premix plant, with operating platforms and precision dosing equipment
Engineering of process
Design of the production sequence
Manufacturing and supply
Equipment, electrical installations, steam and pneumatics
Commissioning and training
Testing, adjustment and operator training
Support after sales
Repairs, spare parts and customer support

Processes in a mineral premix plant.

10 of the 18 processes that Giuliani Hermanos manufactures and integrates in Rafaela, Santa Fe, take part in a mineral premix plant.

Dosing

Accurate dosing of minerals and raw materials to formulate consistent premixes, repeatable from batch to batch and with every ingredient under control.

More info about Dosing

Liquid dosing

Controlled dosing of liquids where the formulation calls for them, blended in evenly without affecting how the mix flows.

More info about Liquid dosing

Mixing

High-homogeneity mixing to spread minerals and micro-ingredients evenly, minimising variation within each batch.

More info about Mixing

Pelleting

Pelleting of mineral formulations where the product calls for densification, easier handling or a particular physical presentation.

More info about Pelleting

Coating

Controlled application of liquids or additives onto granulated or pelleted products, spread evenly and dosed repeatably.

More info about Coating

Bagging

Accurate weighing and bagging of mineral premixes, with systems that adapt to different pack sizes, densities and commercial presentations.

More info about Bagging

Dispatch

Storage and dispatch organised by product or batch, supporting traceability, order picking and distribution of finished premixes.

More info about Dispatch

Questions about mineral premixes.

What capacities can Giuliani build?

Maximum capacity — set by the mixer — is 10,000 litres per batch (around 80 t/h) on one production line; beyond that we add parallel lines.

The remaining answers are in frequently asked questions

Specialist contact

Talk to the mineral premix team.

Tell us what product you make, the target capacity and the stage of the project: an idea, an expansion or a new plant. A specialist for your industry will handle the enquiry.

AddressAv. Int. Zobboli 1944 (former Route 34), Rafaela, Santa Fe, Argentina.